Accessibility
Managing link elements requires an administrator profile with configuration rights.
Definition
Traceability links include link elements, which are input fields on the traceability link between two tables.
The link elements that are generated can contain information, contained by a traceability link between two elements (1). If this traceability link between elements “A” and “B” is removed, the information contained in the link element will be lost (2).

Creating link elements
Example: the “Family A” and “Family B” tables are linked by a traceability link, and this link contains the “Family A-Family B link elements” table. So, when we link an A element to a B element, we can add data by completing fields in the “Family A-Family B linked elements” table.
Information
To use link elements, they must first be activated in the FULL version of GxpManager.
